What's new

2026: General Discussion

Was at the park this afternoon and I noticed something different with the park today.
The Haunting was been loaded every 7-8 mins so they were finishing the main library room and then was loading the 1st pre show room again.
Goldrush was been loaded that quick it was dispatching trains as soon as the other train hit the break run.
Troublesome Trucks was only doing 1 lap to keep the queue down
The Wave had extra members of staff so was been loaded and dispatched quicker.

Anyway at the end of the day I spoke to a few members of staff asking why everyone was making sure they were getting the rides out quickly and they told me the looping group management have been over since the beginning of the month monitoring the park operations and management and they sacked Victoria Lynn and her management team and they managing the park themselves.
 
Noticed Sunday the dispatches on The Wave were a lot faster. Haunting was still on standard 15 min cycles and Gold Rush was slow as heck (mostly because people can’t follow instructions to be fair)
 
Back
Top