That's good to hear they've gone and repaired the damage.The building been repaired and they started to repaint the station
View attachment 7343View attachment 7344View attachment 7345View attachment 7346
That's good to hear they've gone and repaired the damage.The building been repaired and they started to repaint the station
View attachment 7343View attachment 7344View attachment 7345View attachment 7346
Yeah, that would be nice. I did one time thought about what if Thomas, Percy and Rosie's tours had a tender engine to join the tank engines. The three tender engines I thought of were James, Emily and Molly.Wonder if they should consider extending the thomas railway and getting a few more engines like Duck, Oliver or Stepney could be cool to see on the line
That's quite a good point.I don't think they'd do that as they never run all 3 engines at any one time as it is
Can it run all 3 trains never seen it just Rosie and Percy beforeAs we were exiting the park I noticed that Rosie back on the rails. Maybe they getting the trains ready for Halloween
View attachment 7832
They couldn’t as let’s say Thomas is loading 1 end and Percy at the other then Rosie will have to wait near the pirate adventure building to the zoo train has loaded and left then Rosie moves to the zoo station while the zoo train waiting for the Thomas land train to move to where Rosie was waiting and then the zoo train can continue into Thomas land.Can it run all 3 trains never seen it just Rosie and Percy before
I can confirm both are still being usedSo I found the 2 different Thomas engines. So the first one is the 2008 one who was a darker blue and had a gray coupling and grey lamp irons and here's a pictureView attachment 5409
And then there's the 2015 (I believe) thomas who was a lighter blue and had a red and black coupling and the correct black lamp ironsView attachment 5410
Both engines are still at the park but supposedly the 2008 one is in a maintenance and the newer one is the one in operation
So, in other words 2 or 3 years.The contract up in 2027 and the Bryan’s signed the last 1 in 2017. With it been 20 years old in 2028 the looping group have get to decide to renew the contract and spend the money on the original side of Thomas land as some of the buildings and rides need some TLC. Really need more rides based on the engines.