What's new

Maelstrom

It'll be 3 years since they replaced the wood on the exit ramp and station next closed season, i wonder if they'll eventually get around to painting it all anytime soon. There's about 3 different colour schemes for the main building, feels extremely inconsistent. It's a shame because Maelstrom used to be a lovely themed ride and it's lost a lot of what made it special over the past decade.
 
1770002540818.png1770002849950.png

I spotted what seems to be a certain familiar submarine entrance piece whilst having a look around the park on Google Earth, nearing on 10 years since this had been removed and still sat there! someone tell Victoria there's free theming in the back of the park!
 
Even with a time slot, it was painful today. Only 11 seats, with 4 or 5 to the RAP queue so the main queue moved 6 people a cycle.

At this point, probably better to close until it’s fixed.

Anyone know what’s wrong with it? Something with the restraints?
 
Even with a time slot, it was painful today. Only 11 seats, with 4 or 5 to the RAP queue so the main queue moved 6 people a cycle.

At this point, probably better to close until it’s fixed.

Anyone know what’s wrong with it? Something with the restraints?
Couple of weeks ago I asked and they said they were waiting for parts to arrive to fix the seats. Some of them keep locking as well, I went last week and got stuck in one seat and had to be rescued from it by the technicians :LOL:
 
Even with a time slot, it was painful today. Only 11 seats, with 4 or 5 to the RAP queue so the main queue moved 6 people a cycle.

At this point, probably better to close until it’s fixed.

Anyone know what’s wrong with it? Something with the restraints?
I suspect they've replcaed /upgraded (or retro fitted the new energy recovery thing) to the main mechanism? There was a great big cherry picker next to the ride a few weeks ago.

Maybe they're running in the new thing? New motors/engines on old rides need to be run in...

There's a new Gyroswing about to open in Blackpool soon - maybe DM are doing an upgrade to try and stay competitive?
 

Attachments

  • 1777922625808.jpg
    1777922625808.jpg
    2.5 MB · Views: 17
  • 1777922625784.jpg
    1777922625784.jpg
    2.8 MB · Views: 17
I suspect they've replcaed /upgraded (or retro fitted the new energy recovery thing) to the main mechanism? There was a great big cherry picker next to the ride a few weeks ago.

Maybe they're running in the new thing? New motors/engines on old rides need to be run in...

There's a new Gyroswing about to open in Blackpool soon - maybe DM are doing an upgrade to try and stay competitive?
attendant told me it was a problem with the seats and the stuff going on in iran is preventing the parts reaching this country.
 
A few pics from last year during and after a brief breakdown. The ride did about three swings before a loud clacking sound, and the ride stopped.

The M.I.B's were on scene within a few minutes to release us. Apparently the ride tripped the power, so they had to release us manually. One guy was walking across the back of the seats to release one of the locks, whilst the head guy was using something to release the other lock. I was lucky, as I was the one of the first to be released so I was able to take pics. :)

Some poor sod had to climb the ladder on the ride afterwards to check the top of the ride. o_O
 

Attachments

  • 1775238978787.jpg
    1775238978787.jpg
    3 MB · Views: 1
  • 1775238978874.jpg
    1775238978874.jpg
    2.6 MB · Views: 1
  • 1775238978894.jpg
    1775238978894.jpg
    2.5 MB · Views: 1
  • 1775238978954.jpg
    1775238978954.jpg
    2.4 MB · Views: 1
  • 1775238979032.jpg
    1775238979032.jpg
    2.6 MB · Views: 1
  • 1775238979314.jpg
    1775238979314.jpg
    2.6 MB · Views: 1
  • 1775238979455.jpg
    1775238979455.jpg
    2.7 MB · Views: 1
Back
Top